on 01-12-2007 12:28 PM
I have a little specific historical landscape. Actauly both systems(development and prductive has same SID). Basically there is no problem almost 1/2 year.
However now we would like to transport sme things from production .
The thing is number range of transport. I adjusted (table E070L) different number ranges e.g SIDK995000 on development and SIDK990000 on production.
However whenever(e.g the transport SIDK995000) is imported at production the range on production changes to N+1 (e.gSIDK995000)
Thank you for answers which would avoid this
1) Change the SID of one of your systems.
2) Do not create transports on your Production system.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
10 | |
9 | |
8 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.