on 11-15-2006 1:41 PM
Hi Gurus
Is it possible to save the existing Querry in Production system with another name.if yes pl. tel the procedure.
thanks and regard kumar. jskumar7@rediffmail.com
Message was edited by:
s k
Thanks Thangeswaran T.K.
thanks for ur reply and it is helped in solving my problem
thanks again
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi s k,
You can do the query copy in the DEV (development system) & transport the request to the PRD (production system).
This is the SAP recommended best practise.
However, you can also directly do the query copy in PRD system, provided you (sap login) have the authorizations to do the same.
For more information on SAP query, check the following link:
http://help.sap.com/saphelp_nw04/helpdata/en/d2/cb3efb455611d189710000e8322d00/frameset.htm
best regards,
Thangesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
you should be more specific about what you're trying to do or what kind of query you mean.
kr, Carl
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.