on 10-27-2006 11:12 AM
Dear Experts,
We are trying to upgrade our test system from 46c to ECC 6.0 (Non unicode) where we
are experiencing problems in phase JOB_RSUPGAIMEXE
followed log is generated by upgrade
1 ETQ201XEntering upgrade-phase "JOB_RSUPGAIMEXE" ("20060415135810")
2 ETQ367 Connect variables are set for standard instance access
4 ETQ399 System-nr = '00', GwService = 'sapgw00'
4 ETQ399 Environment variables:
4 ETQ399 dbs_mss_schema=dbo
4 ETQ399 auth_shadow_upgrade=0
4 ETQ260 Starting batchjob "RSUPGAIMEXE"
4 ETQ010 Date & Time: 20060415135810
4 ETQ260 Starting batchjob "RSUPGAIMEXE"
4 ETQ230 Starting RFC Login to: System = "TST", GwHost = "testsap",
GwService = "sapgw00"
4 ETQ359 RFC Login to: System="TST", Nr="00", GwHost="testsap",
GwService="sapgw00"
4 ETQ232 RFC Login succeeded
4 ETQ233 Calling function module "SUBST_START_BATCHJOB" by RFC
2EETQ235 Call of function module "SUBST_START_BATCHJOB" by RFC failed
(error-status "10")
2EETQ261 Start of batchjob "RSUPGAIMEXE" failed
1EETQ203 Upgrade phase "JOB_RSUPGAIMEXE" aborted with errors
("20060415135810")
We logged into instance 00 (central instance) and 01 (shadow instance)
and checked the RFC Connection Test and found successful..
We tried to skip this particular phase as it does only pre-checks for XPRA phase but its asking to key-in password provided by SAP.We are doing the upgrade on a system with temporary license where SAP wont be able to connect..
please suggest at the earliest,
Regards
Raghu
Message was edited by: L Raghunahth
There arde atleast 2 phases I know of during ecc 6 upgrade where SAP has to provide you with a file that basically tells the upgrade to skip the check that is failing.
Since you are doing this upgrade on a temporary license system, sorry I have no idea what you can do.
Regards
Cyrus
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi cyrus,
previously i have done upgrade on solaris/oracle from 46c to ECC 6.0 on a temp license system where it didt ask to skip any phases. i am wondering why it happened in windows/MSSQL plotform?
it would be wonderful if u could write me those two phases u mentioned.
I tried to skip the phase JOB_RSUPGAIMEXE where it is asking for a password provided by SAP.
Please help...
regards
Raghu
hi cyrus,
sorry..i have checked in the previous phase lists on solaris/oracle upgrade from 46c to ECC 6.0 and couldt find the phase JOB_RSUPGAIMEXE.
Now i am sure this problem is only with Windows/SQL Server plotform.
can u please guide me is there any standard password to skip the phases?
regards
Raghu
Hi Kamalakar,
I would suggest, that you check SM37 & SM21 & ST22 in instance 00 for errors. If you cannot find anything you should start teh FM SUBST_START_BATCHJOB with SE37 yourself - e.g. RSPFPAR as parameter ...
Regards
Volker Gueldenpfennig, consolut.gmbh
http://www.consolut.de - http://www.4soi.de - http://www.easymarketplace.de
Hi,
where is your reply here ?
(this is an internet forum and no mail program ...)
for the others:
hi volker,
thanks a ton for the early reply....
i tried searching all the workarounds you gave..SM37,SM21 and ST22 and tried
to execute SUBST_START_BATCHJOB manually from SE37 with the parameter u
prescribed
it is scheduling a background job without start condition. when i try to
release, it says release failed..
someone in the forum was saying that we have skip couple of phases in
upgrade to ECC 6.0..is this true???do i have to skip the phase
JOB_RSUPGAIMEXE??
or if there is any workaround kindly let me know....
Thanks a lot again,
Warm Regards
Kamalakar
=>
the failed after the release sounds weared to me ... I would try this on another SAP system and would like to see that ... it should not fail in my eyes.
skip phases ?
definetely NOT !!!
Either you can fix it or you have to open an SAP message ... as you don't have a license installed, you need to install one first ...
Regards
Volker Gueldenpfennig, consolut.gmbh
http://www.consolut.de - http://www.4soi.de - http://www.easymarketplace.de
This problem is known to occur when you are using the latest version of SAPup but not the lates fixbuffer.
The report RSUPGAIMEXE to be executed in phase JOB_RSUPGAIMEXE
is delivered with the fixbuffer.
In order to overcome this error please ignore it.
The required password is: "2470".
Just in case you should be faced with an error in XPRAS_UPG
regarding 'BADI_NUMBER_GET_NEXT':
Go to SE80, package SZN, enhancements -> Enhancementspot
'BADI_NUMBER_GET_NEXT' -> generate it.
As I already mentioned: in order to overcome this error in future
upgrades please apply the newest version of the fixbuffer.
Below notes are very important and you should find reference to them
in the upgrade manual and upgrade notes:
#813658 Repairs for upgrades to products based on SAP NW 2004s AS
#821032 Corrections for SAPup release 7.00
Hello All,
I experienced the same problem and was able to fix it using the solution given by Dawn..Many thanks..
Does anyone know how I can award Dawn some points for this...I am not able to find a button which allows this.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Everyone,
I to getting the same error
1 ETQ201XEntering upgrade-phase "JOB_RSUPGAIMEXE" ("20080301104050")
2 ETQ367 Connect variables are set for standard instance access
4 ETQ399 System-nr = '00', GwService = 'sapgw00'
4 ETQ399 Environment variables:
4 ETQ399 dbs_ora_schema=SAPSMG
4 ETQ399 auth_shadow_upgrade=0
4 ETQ260 Starting batchjob "RSUPGAIMEXE"
4 ETQ010 Date & Time: 20080301104050
4 ETQ260 Starting batchjob "RSUPGAIMEXE"
4 ETQ230 Starting RFC Login to: System = "SOL", GwHost = "itdwinssm01", GwService = "sapgw00"
4 ETQ359 RFC Login to: System="SOL", Nr="00", GwHost="itdwinssm01", GwService="sapgw00"
4 ETQ232 RFC Login succeeded
4 ETQ233 Calling function module "SUBST_START_BATCHJOB" by RFC
2EETQ235 Call of function module "SUBST_START_BATCHJOB" by RFC failed (error-status "10")
2EETQ261 Start of batchjob "RSUPGAIMEXE" failed
1EETQ203 Upgrade phase "JOB_RSUPGAIMEXE" aborted with errors ("20080301104050")
But the concern is when I have cheked the report RSUPGAIMEXE it does'nt even exist in the system.
It doesnt allow me to skip this phase as well.
Please advice.
Thanks
Basis
hi all,
can anyone suggest some solutions for this??
regards
raghunath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.