on 09-15-2006 10:09 AM
Hi,
I'm doing a xslt mapping which involves 2 souce xml files and one target file.I had to get values from the two source files and populate it in the target.I tried doing it in integration builder and it worked.
But my scenario also involves BPM,where in the transformation step i specified the interface mapping with the appropriate abstract source interfaces and one target interface.
But when i perform the end to end scenario it fails.Transformation step is not happening in BPM.Even i tried the same thing in XML spy it worked.
So my question is when the xslt mapping is working in design builder why is it failing in BPM.
Can anyone solve my problem
regards
JIthesh
Message was edited by: jithesh balakrishnan
i have had numerous occasions when i have used XSLT inside the BPM and it works fine. I assume u wud have already checked the interfaces being passed to the transformation step, the messages etc.
But now maybe u can try this option - /people/shabarish.vijayakumar/blog/2005/12/07/transformation-error-and-still-stuck
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.