cancel
Showing results for 
Search instead for 
Did you mean: 

Variant UOM issue

former_member477577
Participant
0 Kudos

Hi,I have Variant configuration issue please check and revert back as soon as possible.

In variant configuration I have two variant one is Length and other is color where I am putting length manually once it determine in sales order and select color from variant list.

Letu2019s take example, 5.5 M length manual entry and color RED selecting from variant list.

Now I have made two conditions VA00 for color automatic price determination from condition record and VA01 for length manual entry as it is manual length entry.

Now problem is, I m selling material in pieces so base unit is PC-pieces and sales order pricing should be in Meter.

In standard material selling length is 6 M so I have given conversion 1PC=6M and maintain condition record according thatu2026.it is right..

In variant scenario length is not standard we can put 5 M,5.5 M ,4.2 M and so onu2026..

Even I m maintaining condition record for variant color I have to put standard conversion like 1PC=6M.It is not possible in variant scenario as length is not standard.

In this scenario I m putting manual length, color from variant list and selling material in pieces then how we will determine the price in meter.

Thanks in Advance

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member477577
Participant
0 Kudos

Any suggestion...??