on 02-28-2012 2:23 AM
Dear Gurus,
I got a problem abount sample calculation. I have completed the following steps,
1. Create Sample-drawing procedure with fix sample = 7
2. Create Sampling procedure with fix sample = 3
3. Assign sample drawing procedure and inspection point 200 to inspection plan header
4. Assign sampling procedure along with MIC to inspection plan
When the inspection lot is created, it only have 1 physical sample instead of 7. However, if the fix sample of Sampling procedure is updated to 1. 7 physical samples will be created in inspection lot. Could I know the calculation method of system?
Hi,
Maintain 1 in the Sampling Procedure. In the Physical Sampling Procedure; maintain7. Then, you'll get 7 sample units. Here, the logic seems to be: Number of sampling units that comprise a Sample. So, your Physical sample = 7, Sampling procedure=1.
Remember: in Physical Sample Drawing Procedure (QPV1) there is Size Factor which is maintained at 1 by default. That could be the reason. I am quoting from the Performance Assistant in t-code: QPV1, for Size factor:
+The system uses this integral factor to calculate the sample size for a primary sample. In doing so, it multiplies the inspection scope (in sample units of measure of the physical sample) by this factor.
Example
The inspection scope is 50 ml. If you specify a factor of 3, the system calculates a total physical-sample size of 150 ml.+
Regards, KrishnaM
Edited by: Krishna. Madduri on Feb 28, 2012 2:48 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Then give us some more data. What UOM are you using in the inspection plan? What UOM are u using in the MIC? What container type did you receive in? How many containers were received? Did you use partial samples?
The sampling process is pretty stable in SAP so it would be unlikely you are seeing a bug. It's more likely that there is something funny with your master data set up.
FF
Can you tell which physical samples are created.Primary ,Pooled or reserve. ?
and
Howmany Operations & respective MIC's are there ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.