on 02-23-2012 4:52 PM
hi
I have a SAP A to SAP B ( sync proxy to Proxy ) scenario...
Here I have created a Business system called SAP_BACKEND for SAP A...
When a message is sent from SAP A and I check in SXMB_Moni in SAP A the sender system is not SAP_BACKEND but R3_SAP like that
how do i change this because this is giving me no receiver determined error
check the integration engine configuration in SAP A.
Also in SLD check if the business system is assigned to the correct Technical system and client of SAP A
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
SAP_BACKEND is pointing to the tech system and client of SAP A...
Also I have imported it correctly in ID....
R3_SAP is not in SLD.....
How do I check the integration engine config of SAP A ( I checked in SXMB_ADM->integration engine config and it is pointing to PI )
My observation -- SAP A was earlier pointing to some other PI system . could this be a problem?
Hi,
Check this link [http://wiki.sdn.sap.com/wiki/display/XI/ConfigurationofSAPBusinessSystemstousetheWSAdapter-ABAP7.0]
Regards,
Venkata S Pagolu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear hema
I think you did not imported the Business system for SAP A from SLD.
is R3_SAP the business system in SLD?
if that is so then you need to import this business system and create your configurations using it.
Regards
Sourabh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.