cancel
Showing results for 
Search instead for 
Did you mean: 

Issues in stability study

Former Member
0 Kudos

Dear Gurus,

Can anyone please describe the procedure that are required for performing Stability Study.

When I create initial inspection lot, its status is created. When I go for sample size calculation, Flexible Selection and Changing of Specifications is shown, what is this?

Please Elaborate, Thanks in advance

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

Create inspection plan with proper usage, assigned it with ur sampling lot Via QA02.

Regards