cancel
Showing results for 
Search instead for 
Did you mean: 

BOP is not rescheduling dates after change in conditions

Former Member
0 Kudos

Hello,

We have implement GATP in our businness and we are facing a problem concerning scheduling.

For example: we increase the hours dedicated to transport operations in scheduling. After BOP there is no change in material availability date (although in BOP_RESULT I can see that the change in conditions is applied). That means that BOP do not send any change to ECC i.e. no rescheduling of dates is done, which I think is wrong.

Is this a normal situation?

I have already checked the "Rescheduling" switch in BOP

Best Regards

Pablo

Accepted Solutions (0)

Answers (1)

Answers (1)

michael_thinschmidt
Contributor
0 Kudos

HI Pablo,

You need to reset the scheduling buffer when doing a change on the customizing. Run report /SAPAPO/SCHED_BUFFER_RESET and enter the corresponding locations. The buffer is resetted automatically after a certain timeperiod (I think 30mins), so the system is using still the old values for scheduling if you just changed the customizing.

best regards,

Michael