cancel
Showing results for 
Search instead for 
Did you mean: 

PI system not working after switching on cluster environment.

Former Member
0 Kudos

Hi,

We have PI system configured on cluster environment, with 2 nodes - Node 1 and Node 2. SLD, ABAP and J2EE engine are configured on Node 1. When PI system runs on Node 1, everything works normally.

When system switches between from Node 1 to Node 2, PI does not connect to Non SAP system ( Java based adapters ).

Can you please guide me to where the problem could be or what are the services needed at Node 2 for successful PI working ?

Thanks,

Swapnil

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Check out the ip address or server name specified the java adapter definition.

Also check out ping from your java adapter server to Node 2.

Former Member
0 Kudos

Thanks Hussain for your reply,

But where can we find the java adapter definition?

Thanks,

Swapnil

Former Member
0 Kudos

Definition has to be in the external system which is trying to connect to SAP

It depends on which external system you are using

Former Member
0 Kudos

SAP Messages server ip address and server name specified in the java adapter definition & this ip address & server name ping successfully from java adapter server to node2

Former Member
0 Kudos

Is it now able to connect ?

Former Member
0 Kudos

SLD configured on Node 1. When PI system runs on Node 1, everything works normally.

When system switches between from Node 1 to Node 2, PI does not connect to Non SAP systemSDM server is runing on Node1

Former Member
0 Kudos

Where your SDM server is running is not important for NON - SAP system connection.

Try using Virtual server Name (in Adapter description )used for clustering and check if it connects on Node1 and Node2