Hi experts,
How can assign multiple testing schedule to a stability study with respect to different storage conditions using single strategy.
Eg. Strategy for 1 M, 2M,3M, 6M,9M,12M,18M
FOR 25°-- SCHEDULE FOR 1,2,3,6,9,12,18M
FOR 30°--SCHEDULE FOR 1,2,3,6,9M
FOR 40°--SCHEDULE FOR 1,2,3,6M
I dont want to create different stability study for above scheduling
John.
Dear John/Muraribhai,
I have one idea for the same.
1) First you have maintain one strategies for all condition like below,
Common strategie : 1,2,3,6,9,12,18M (for 25, 30 & 40)
2) Now you create one common inspection plan with all operation which are come in 25/30/40 'C.
3) Now you have maintain the CWBQM with this one strategie.
4) At the time of notification, You have to maintain different storage location.
I think it will work.
Regards,
Sandip
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Same issue with us
for three different storage condition 3 separate inspection plan available and into that 3 different strategy assigned so when create stability notification at time in create testing schedule in that strategy have to assign but that strategy is not similar to inspection plan strategy at time of assign inspection plan system gives the error.
Regards,
Murari shah
FOR 25°-- SCHEDULE FOR 1,2,3,6,9,12,18M
FOR 30°--SCHEDULE FOR 1,2,3,6,9M
FOR 40°--SCHEDULE FOR 1,2,3,6M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
As u said already u assigned the strategy for analysis frequency , create the Quality plans and then assigned it, there is lot for particular strg location at particular freq. which u have sated for different strg conditions.
U may also use the same strategy for different conditions , it is very similar like that of PM task list creation strategy assignment and lot creations.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As I know you can create only a testing schedule to plan the scope and frequency of the stability tests and separate inspection plans for each storage condition.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.