Modify & activate new Insp.plan for the released lot.

Former Member
0 Kudos

Hi,

My Inspection lot Status is now REL CALC SPRQ QLCH.

I Have to change / Add inspection plan of the same component before processing Results & UD

Kindly guide me the withdrawal of the old plan and to activate the modified Inspection plan for that component.

Pls. help me.

Surya

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

You can only do this if you haven't done anything to the lot. If you see an INSP status, you cannot do this.

Go to QA02 and reset the sample and then change the key date.

On the spec tab reassign the specs.

On the sample tab, recalculate the sample size,

Save