Modify record resulting with Inspection lot

Former Member
0 Kudos

I have created an inspection lot , i have also recorded the results according to my plan.

However there was a change in the inspection characteristics so i modified my plan .

But i had already recorded the results as per my old plan now i want to modify the recording.

I have not given the UD .

can I modify ?

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member221025
Active Contributor
0 Kudos

Hii..

You can not assign new inspection plan for the Inspection lot with Status INSP.

It will be effective from next inspection lot you create.

you can add unplanned characteristics while result recording, just press F5 or Go to Edit>Create Additional characteristic.

(MIC has to be Complete copy model)

Regards,

Amol

Former Member
0 Kudos

You can change the result recorded for a Inspection lot if UD is not taken .

In result recording screen : Click on the option "Put to Process" The status will change from 5 "Processing completed" to 2 "Inprocess". Then remove the result for that characteristic and save it.

But you can not revoke the result recording status "RREC" .

So if you have to attach other task list you have to create new Inspection lot.

Former Member
0 Kudos

IIf it the MIC is of complete copy model the you can add this to the existing lot after UD. Go to UD screen and click on edit->Reset->Inspection completion. The lot status will change to LTIN (long term Inspection). Save it and click on results click on additional characteristics and then put the mic. Do result recording.

Regards,