on 01-28-2012 5:18 AM
Dear All,
My client has a scenario where he often moves equipment from on site(plant) to another site(plant).At any point of time he want to track the list of equipment at a plant.and He wants to track the movement.What business process do we need to follow to move the equipment from one plant to another plant.pls help me with my queries....
Thanks & Regards,
CSR.
Dear Maheshwaran,
As you suggested i have checked in IH08.there i can see the plant and date of validity of equipment in that plant.Now only my question while transferring the equipment do we need to generate any document in sap? currently our client has equipment movement document in which he will mention equipment name ,from plant and to plant...pls help..
Thanks & Regards,
CSR.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
If you map using installation & dismantling you can get the history of installation & dismatling using IH08 (where you will find the functional location with date). In this case, there is no goods movmt so no documents required. If you map it using serialisation procedure then you can get the movement documents
Shakti
Dear maheshwaran/shakti,
I did the same way.i have defined each site as functional location and changing the maintenance plant.But where i can c that equipment is moved from site X to site Y.Or other way the current location of the equipment....
if i try to use serialization ,configuration will take much time or any effect on MM?....
awaiting for all ur inputs....
Thanks & Regards,
CSR.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
you can solve this issue using serial number . if you are using serial number that links equipment and material so when ever you transfer material related to that equipment then you get the history of that equipment by the serial number. and for the movement type 301 is transfering material from one plant to another plant using t.code MB1B.
I think it will help you,
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I feel each site could have been created as functional location, so that equipment movement between sites would be easier.
As each site has been defined as plant, change the maintenance plant in the equipment. If equipment has been installed to any FL, then dismantle from that & change the maintenance plant.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Installation & dismantling at functional location feature of equipment can be used to map your requirement. However you need to change the maintenance plant of this equipment frequently.
Another way of mapping this is through serialisation of material/equipment. Assign serial no to the equipment alongwith material no. You can do installation/dismantling with goods movement with T code -IE4N. Once you dismantle this serial no comes as a stock to a storage location & you can do Plant to plant transfer of serialised material using movt type 301(Tcode-Mb1B)
Shakti
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.