Hi Gurus,

I have a requirement where the customer wants the Material Availability Date to default to 15 days before the Delivery Date.

I have tried to maintain the pick/pack time , load time against the shipping point but it does not reflect when I create a new order.

Can someone pl. tell me what other setting needs to be done for this?

Accepted Solutions (0)

Answers (1)

Answers (1)

jpfriends079
Active Contributor
0 Kudos

For better understanding, refer one of the SDN wiki on ATP:

- [ Available to Promise - ATP |http://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabletoPromise+%28ATP%29]

Regards

JP

Former Member
0 Kudos

Thanks for the link JP. It is useful... I will go through the same.

In my scenario it is a make to order scenario with variant configuration. So will it follow the same process as mentioned in the link you provided...

jpfriends079
Active Contributor
0 Kudos

Yes it should. As any how the system determine scheduling on the bases of backward scheduling. Take into following Org structures into consideration:

- route

- shipping point

- material

- ship-to party

Generally, system will automatically determines the scheduling. If in case, the system is not able to honor the manually entered date by user then system automatically determines the earliest date on which the sales order quantity can be confirmed based on backward scheduling.

Regards

JP

Former Member
0 Kudos

Thanks JP... I was able to resolve my problem...