Measurement Document in PM

Dear all,

I wish to generate the measurement document for a PRT in the background while confirming the production order. But it wont generate eventhough i follow the instructions as per the information collected in the forum.

I created PRT as equipment and give usage formula as SAPF02 and the measuring point also attached. In routing also. PRT has been attached. But I dont know what value must be given in the usage value field, While attaching PRT in the production order.

Can anyone resolve my pbm?

Regards

Karthik

Former Member replied

I hope you have gone through the threads attached in previous post.

Apart from creating your own measuring point in IK01, have you assigned that as default? In equipment master, maintain usage value formula.