Creation of detailed packing list from SAP PS

Former Member
0 Kudos

Dear Sir,

We have ETO scenario and are in the business of manufacturing "Industrial Machinery" . We are using Project System (PS) also . After the final assembly the FERT Equipment gets ready and then it is put on trial for testing . After the successful trial the equipment is again disassembled into the desptachable parts and then delivery are created from the project .

Along with the Equipment , we also send the free spares and installation parts.

Kindly guide us as what steps need to be followed so that we can have Packing List generated from the SAP system for the items being shipped to the customer .

With Thanks and Rgds

Anil Kamat

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi

include those items as bill of materials for the equipment

Former Member
0 Kudos

Hello AP, The BOM has already been created .But is there any method in particular in PS to add attributes to the Items and finally autogenerate the Final Packing List for Shipping to customer.

Thanking You,

Regards,

Anil Kamat

former_member230675
Active Contributor
0 Kudos

I think your Finished Product Should have item category group ERLA in sales org 2 tab with a Sales BOM created and finally create delivery from Sales Order (I am not sure) Please test and also check with your SD consultant.