We have a scenario where multiple products are produced in the multiple resource and Multiple products can be produced in the single resource.

We want to allocate capacity in the resource for different Products.Is it possible in PPDS?

Regards

RK

Accepted Solutions (1)

Accepted Solutions (1)

m_manimaran
Active Contributor
0 Kudos

Hi,

This can be done using capacity reservation functionality. Please refer the below link for further information.

http://help.sap.com/saphelp_SCM700_ehp02/helpdata/en/46/19c0218716424fe10000000a1553f6/frameset.htm

Regards,

Manimaran M.

Former Member
0 Kudos

Hi Manimaran

This capacity reservation functionality only works with CTP?

Can this functionality can be applicable in Heuristics or Optimizer.

Please clarify

regards

RK.

m_manimaran
Active Contributor
0 Kudos

Hi,

Capacity reservation can be handled with heuristics and optimizer also. I have seen them working with heuristic and optimizer in PPDS.

Regards,

Manimaran M.

Former Member
0 Kudos

Manimaran

Appreciate for the quick reply.

1) Capacity reservation can also be possible for products level ?

2) I want to know which heuristics in PPDS, takes capacity reservation ?

Regards

RK

m_manimaran
Active Contributor
0 Kudos

hi RK,

1.It is very well possible to use the capacity reservation at the product level. We have to maintain the capacity reservation group with the product characteristic.

2. Any heuristic run with the finite scheduling strategy will consider the capacity reservation. So, we have to make sure that the scheduling strategy has finite scheduling active.

Regards,

Manimaran M.