on 01-13-2012 8:37 AM
The control chart in the sampling method does not match the insp. char.
Message no. QD240
how solve?????
Please maintain Control Chart Type: Shewhart chart for p / sample / UAS
Sharan.M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You need to compare 'requirement for control chart' and 'control indicator of insp. characteristic'.
1. Requirement for control chart
QCC0 > Quality Planning > Basic Data > Sample, SPC > Statistical Process Control > Define Control Chart Type
See detail for your control chart and check 'requirement' in characteristic type screen area.
2. Control indicator of insp. characteristic
QS24
Check 'control indicator' is suitable for requirement.
Regards, Do Wook KIM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
Use Sampling type with "SPC control chart" valuation. and number of sample u assigned. it is more than 1. Assigned the control chart correctly w.r.t. MIC's in quality plan.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi please check the sampling procedure for the MIC. For control chart you must use fixed sample and for the MIC the sampling procedure may be different.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.