cancel
Showing results for 
Search instead for 
Did you mean: 

The control chart in the sampling method does not match the insp. char. Mes

Former Member
0 Kudos

The control chart in the sampling method does not match the insp. char.

Message no. QD240

how solve?????

Accepted Solutions (0)

Answers (4)

Answers (4)

sharanagu
Explorer
0 Kudos

Please maintain Control Chart Type: Shewhart chart for p / sample / UAS

Sharan.M

former_member207800
Active Contributor
0 Kudos

You need to compare 'requirement for control chart' and 'control indicator of insp. characteristic'.

1. Requirement for control chart

QCC0 > Quality Planning > Basic Data > Sample, SPC > Statistical Process Control > Define Control Chart Type

See detail for your control chart and check 'requirement' in characteristic type screen area.

2. Control indicator of insp. characteristic

QS24

Check 'control indicator' is suitable for requirement.

Regards, Do Wook KIM

Former Member
0 Kudos

hi,

Use Sampling type with "SPC control chart" valuation. and number of sample u assigned. it is more than 1. Assigned the control chart correctly w.r.t. MIC's in quality plan.

Regards

Former Member
0 Kudos

Hi please check the sampling procedure for the MIC. For control chart you must use fixed sample and for the MIC the sampling procedure may be different.