Dear QM guru here,

I have QM order link to inspection lot, order type is QL01.

during i record result, i also confirm activity of labor processing.

my problem is the screen of confirmation activity have only 3 field can input. 1. activity quantity 2. work center 3. plant.

so every time i confirm activity system always record as system date.

but i would like to post back to the previous. so can we config to change this screen to show date that allow to change during confirmation.

Thank you in advance.

Konnapa

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi,

Yes u may change the screen content but for that u need the screen no. and u may also take the help of an ABAPr, for screen modifications. and if u want back date posting than use user exit QLCO0002 for this.

or if u simply want the proposed dates or confirmation dates (Previous) than u need to check ur config. -


> Parameters for order Confirmation.

Regards

Edited by: D GURU on Jan 4, 2012 1:04 PM

former_member188010
Participant
0 Kudos

Dear D GURU,

Thank you very much for your helpful solution.

I try to change config for "parameter for order confirmation" already and tested but nothing changed on QM order confirmation screen.

anyone have any more ideas

Regards,

Konnapa

Former Member
0 Kudos

hi,

as already i told u if u need dates on confirmation screen than u need to read the fields and put the indicator ok over there. secondly, if this not solve ur prblm than use the exit with the help of an ABAP'r.