Dear Experts,
I want to test source inspection. I have done following:
1. Activated 0101 inspection type in material master. Maintained 01 as preferred inspection type.
2. Chosen QM control key.
3. Maintained Q-info record with release quantity active, source inspection-no GR control, and maintained the status profile in it.
4. Created inspection plan with characteristics for result recording of lot.
5. Created purchase order and released it.
But when i am generating worklist for source inspection lot through QI07, i am getting exception message as comment "source insp. not possible due to rel. status.
Please advise how to get lot.
Regards
Sunit
Dear Sunit,
I had faced same problem,
Problem was with Status profile which i had maintained in QI info record.
I removed that status profile and Problem got solved.
system allows GR even if source inspection is not done which i dont'want.
I dont think, this is related to Status profile. It depends upon "Source insp-GR" field in QM info record.
So, remove status profile from QM info record and you can create Insp. lot from QI07.
Regards,
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sunit,
the problem is with "lowest Status number" and "Highest status number" which you maintained in Status profile.
1st Check, what is the Status which is currently active, It will be Initial status mentioned in Status profile, unless you have changed the status in QM info.
I prefer to Use status nos as 10,20,30 40 ...... instead of 1,2,3,4.... .
Change "Highest status number" for the status which is currently active.(you can give Status number as its Highest Status no.)
Regards,
Amol
hi,
Check status field in Q-Info, it is mainted or not, if it is maintaained than it indicates with supply relationship management, if u don't want than remove the status profile from Q-info, or if was ur pre-defined setting than change status of PO and info- record.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check the quantity of PO & qty entered in " release quantity active" in Info record.
Try to use date release instead of "release quantity active" ,then check QI07.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sir,
As i said in fiest settings point 3, that tick is already given.
I did my settings as per the document by Manjunatha mentioned in this link
http://forums.sdn.sap.com/thread.jspa?messageID=10630354#10630354
Regards
Sunit.
status profile and source inspectin are entirely 2 different concepts
for source inspection u have to maintain followinf
in q info record
Source inspection - 01
Lead time (in days) 0
tick source inspection -no GR (as per requirement)
activate 01 inspection in qm view
no need to maintain status profile and 0101 inspection
now create PO, go to QI07 PUT Delivery Date as PO delivery date ,Opening period (D) 0 and check
create source insp lot
u can create GR for the same PO even if source insp is not cleared
SAP provides restriction on GR if source inspection lot is rej.
Hope this will solve ur issue