on 12-28-2011 2:59 PM
Hi,
Can you please help me in configuration of Mopz's in solution Manager 7.1 so that i can do step by step installation.
Thanks & Regards,
Sreeram
Follow this guide below for MOPZ solman 7.1
http://help.sap.com/saphelp_sm71_sp01/helpdata/en/46/418970cdb45fabe10000000a1553f7/content.htm
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I can give your the overview, but you need to go thru the guides as well in order to get the full pic.
If you've completed solman_setup -> system preparation and basic configuration, your MOPZ is ready, where at this time, you've entered your S-USer info, SLD<->LMDB sync is performed and etc..
What next is you need to assign your SAP System to correct Product, Product version in SMSY + LMDB. Once done, assign your SAP System (or so call Product System) to logical component (in SMSY). After that, create a landscape solution in solman_workcenter and assign your logical component to it.
You can run the MOPZ in solman_workcenter -> change management.
Hope it helps,
Thanks,
Nicholas chang
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Go to the install guides, then solution manager and the 7.1 version and there you will find all the instructions for configuring solution manager. Also, check out this link,,,this should be a big help for you.
http://wiki.sdn.sap.com/wiki/display/SMSETUP/Home
Have a happy SAP day !!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.