on 12-27-2011 12:30 PM
Dear Experts,
I made MIC with the following control data:
Type:
x lower specif. limit
x Upper specif. limit
Sample:
x Sampling procedure
x spc characteristic
Result confirmation:
x Summ. recording
X required char
Then I created a sampling procedure with these data
Sampling type: Fixed sample
Valuation mode: 500 Manual valuation
control char type: 111 shewart chart for x-bar/sample
sample size = 5
then I created a inspection plan with these mic and sampling procedure
SPC criterion: 060 master inspection characteristic
when i am saving the quality plan it is throwing an error message "The control chart in the sampling method does not match the insp. char."
please help me.
Hi...
instead of "Manual Valuation" you have to maintain Valuation Mode: SPC inspection.
According to me all other things are fine.
Regards,
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
plz Check ur CHart which u have assigned.
regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear qmconet,
Control chart type, and SPC criterion used by you are Standards. U need not to do any customization.
What i think is, standard settings of Control chart type are changed.
Kindly check
SPRO>IMG>QM>Quality Planning> Basic Data>Sample, SPC>Statistical process Control> Define control chart type.
regards,
Amol
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.