on 12-26-2011 6:01 AM
Dear Friends,
I have a scenerio in if any material require source inspection then before UD, GR could not be posted in the system.
is there any way?
Regards
Hi Sumit,
This is not possible, However, you can stop GR in case the UD of source inspection is rejected.
is it possible to do GR in case the UD of source inspection is rejected. If yes, please elaborate process.
Thanks in advance
Ganapathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
U need to customize it with user exit QAAT0002, where u need to define if UD code = Blank than no further processing or GR blocked.
in Std SAP , in case of any Rejection if u want than u customize it .
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
This is not possible, However, you can stop GR in case the UD of source inspection is rejected.
Thanks
SUMIT
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.