Source inspection

Former Member
0 Kudos

Dear Friends,

I have a scenerio in if any material require source inspection then before UD, GR could not be posted in the system.

is there any way?

Regards

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Sumit,

This is not possible, However, you can stop GR in case the UD of source inspection is rejected.

is it possible to do GR in case the UD of source inspection is rejected. If yes, please elaborate process.

Thanks in advance

Ganapathi

Former Member
0 Kudos

hi,

change control key before GR in MM , which allows all type of control during procurement.

this may resolve ur prblm, and if u need some more action than as i sadi use exit for furher enhancement as per ur req.

Regards

Former Member
0 Kudos

Thanks all for prompt reply.

yes GR can be blocked if UD is done before GR and it should be "Rejected". for this "NO insp lot @ GR" should be maintain in Quality Info record.

GURU Can u plz explain the control key of MM otherwise i will go for User exit.

Former Member
0 Kudos

hi,

Check SPRO -> Quality Management-> Quality in logistics--> Quality in Procurement- Control Key

If u want than u define urself new as per the business requirement. or use the user exit as i mentioned in ma post for more actions.

regards

Former Member
0 Kudos

hi,

U need to customize it with user exit QAAT0002, where u need to define if UD code = Blank than no further processing or GR blocked.

in Std SAP , in case of any Rejection if u want than u customize it .

Regards

former_member662213
Contributor
0 Kudos

Hi,

This is not possible, However, you can stop GR in case the UD of source inspection is rejected.

Thanks

SUMIT