cancel
Showing results for 
Search instead for 
Did you mean: 

How to extract ST03/ST03N report for user defined period?

Former Member
0 Kudos

Hi ,

In ST03/ST03N we have the option to extract the report for a month/week/day.

But I want to know if there is a way to extract the report for a specific period.

For example,

Standard week option is 12/12/2011 to 18/12/2011.

But If I need to extract the report from 14/12/2011 to 20/12/2011, how to do it?

Thanks in advance.

-Aravindan

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello Aravindan,

I think you can get that data from EXPERT MODE in ST03N. Please take a look at the following link for more details.

http://help.sap.com/saphelp_46c/helpdata/en/f3/0a8ba835e1d311ba4d0800060d888b/content.htm

Thanks,

Siva Kumar

Former Member
0 Kudos

use st03n

last minute load

Total

Regards

Denis Rossi

former_member189725
Active Contributor
0 Kudos

I feel its not possible to have workload data for a specific period in the standard. Only you can have workload data for a specific time period from the last minute load option.

former_member204080
Active Contributor
0 Kudos

Hi,

There is no such option to check like that.If you want u can generate the report in a day from particular time to other by using

last Minute load in expert mode.