When i'm creating sales order more than availability quantity, in item level schedule line tab it was showing next delivery date.
My question is How it was calculating next delivery date? apart from In house production days.
Check for that sale order type in VOV8 what data is maintained under the tab "Requested delivery date"
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI,
Propose delivery date :Propose today date as delivery date,if material is available the schedule line's are confirmed for today.
Lead time in days : if you maintained any lead days here system will take those days into consideration and propose delivery,if
the lead days are 5 on the 5th day if material available it will confirm the schedule line's if not it will take in house production
days.That means 5 days + in house production +loading + packing time (From shipping point) taking all this into consideration it
will finalize the schedule delivery date.
Regards
Ram
Hi
In Material master in MRP 2 View we maintain the time.
and we Have RLT Check box at Carry out control for availability check in Availability check configuration.
Please find the below link
http://help.sap.com/saphelp_470/helpdata/en/f4/7d328744af11d182b40000e829fbfe/content.htm
Thanks
Dasaradha
Edited by: dasaradha ramireddy on Dec 22, 2011 7:48 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Friend,
system automatically proposes the current date as the delivery date. If the stock is not available to fulfill the sales order system considers the RLT Time and proposes new date.
Thanks
Dasaradha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.