on 12-18-2011 9:55 PM
Hi Experts,
I'm new to SRM.
We have requirment for N-Level Approvals Sequentially at item based for the SC .
The Approval Level needs to be determined dynamically , by comparing the Total value of the SC with the Approval limit maintined in the Custom Table.The maximum Level of approval is 3.
Example:
Workitem Should be triggered Sequentially.
If the SC has 2 line items .
First Line item
When the Ship-to address is maintained,the Total values of SC - 3000£ and the Line item Value is above threshold value.
Workitem reaches Approver1 - Approved then
Workitem reaches Approver2- Approved then
Workitem reaches Approver3
Second Line item
When the Ship-to address is maintained,the Total values of SC - 3000£ and the Line item Value is below threshold value.
Workitem Shouldnot Trigger.
Questions:
Do i need to maintain 1 or 3 process level at Config?
is it possible to check the Line item value at the Evaluation ID itself by copying the FM /SAPSRM/WF_BRF_0EXP000
, if so how to to know the for which line item(item guid) the Process level is been called?
There are three conditins to be checked for triggering the workitem
1.Ship to party check
2.Total value Sc check
3 Line item value check
Which conditions can be maintinaed in the Evaluation Id?
Which conditions can be maintinaed in the BAdi?
How to Achive the requirmeent.
Please Let me know how to proceed.
Thanks in Advance.
Edited by: srmtech on Dec 19, 2011 11:31 AM