cancel
Showing results for 
Search instead for 
Did you mean: 

material determination for RRB

salim_shakir3
Explorer
0 Kudos

Hi

We are implementing resource related billing. We have a situation

wherein we have seperate material codes for consulting and training but

they are both linked to the same cost element.

When I configure through ODP1, I can link only one material to a cost

element in material determination. We would like to link 2, one for

consulting and the other for training which should be selectable when

we create the quote or DMR. Is this possible? Is there a user exit or

BADI for this?

We want one material for our consulting WBS and one for training

Thanks in advance

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Apart from cost element there are various characteristics for material determination. Alternatively user exit SAPLAD15005 to be used.

Please "confirm" once solved for benefit of all SDN members

-Chandresh

jpfriends079
Active Contributor
0 Kudos

In your DIP profile in material determination maintain both material.

Thus, first update the cost in project & select the material based on requirement in RRB execution.

Regards

JP

salim_shakir3
Explorer
0 Kudos

I did that JP and Chandresh.

I entered characteristic as material and ticked material determination. Then I enter both the materials consulting and training.

In my ECP I have entered hrs as it is T&M (i.e activity type/cost center combination). I could create cost plan succesfully based on hrs entered and labor rates. When I click on sales pricing in project builder to create a quote it says no expenditure items found. How do i corelate the material with the activity type/cost center combination

Regards

Salim

jpfriends079
Active Contributor
0 Kudos

How do i corelate the material with the activity type/cost center combination

SOURCE

Check your

- source in DIP profile (ODP1),

- Cost condition for sales doc type (ODP4)

- costing sheet (KZSZ).

No expenditure error, your WBS should be relevant for billing.

Regards

JP

Shiva_Ram
Active Contributor
0 Kudos

I recommend you going through the documentation provided in OSS Note 301117 - Enhanced documentation for dynamic item processor (DIP) to resolve the issue.

Regards,

Shiva_Ram
Active Contributor
0 Kudos

Check whether the best practices document provides details on this at http://help.sap.com/bestpractices/BBLibrary/html/J46_FixedPTMBProject_EN_US.htm

Regards,