on 12-15-2011 12:43 PM
Hi,
I have added Unload point field in both PO and confirmation screen in SRM. The values of this field should be passed to R/3 PO.
If I change the unload point in PO, it is being updated correctly in R/3. Once in the PO confirmation, if i change the unload point, it is not being copied to R/3.
We found the Idoc type MBGMCR01 is being used to transfer the confirmation data to R/3 system. In the Idoc, segment E1BP2017_GM_ITEM_CREATE contains the unload point field. Value is being passed to this field. So it is not moving to R/3 system.
What is the function module used for this Idoc? Where do i need to map this field?
Thanks,
Ezhil.
IDOC_GR_CREATE is the FM which does the idoc creation in SRM for posting confirmations to ECC as GRs.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
check this FM
BBP_PD_CONF_TRANSFER
Regards
G.Ganesh Kumar