SRM PO confirmation to R/3

Former Member
0 Kudos

Hi,

I have added Unload point field in both PO and confirmation screen in SRM. The values of this field should be passed to R/3 PO.

If I change the unload point in PO, it is being updated correctly in R/3. Once in the PO confirmation, if i change the unload point, it is not being copied to R/3.

We found the Idoc type MBGMCR01 is being used to transfer the confirmation data to R/3 system. In the Idoc, segment E1BP2017_GM_ITEM_CREATE contains the unload point field. Value is being passed to this field. So it is not moving to R/3 system.

What is the function module used for this Idoc? Where do i need to map this field?

Thanks,

Ezhil.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

IDOC_GR_CREATE is the FM which does the idoc creation in SRM for posting confirmations to ECC as GRs.

Former Member
0 Kudos

Hi,

check this FM

BBP_PD_CONF_TRANSFER

Regards

G.Ganesh Kumar