on 12-14-2011 10:20 PM
Hi
We are implementing resource related billing. We have a situation
wherein we have seperate material codes for consulting and training but
they are both linked to the same cost element.
When I configure through ODP1, I can link only one material to a cost
element in material determination. We would like to link 2, one for
consulting and the other for training which should be selectable when
we create the quote or DMR. Is this possible? Is there a user exit or
BADI for this?
We want one material for our consulting WBS and one for training
Thanks in advance
HI,
In characteristics take material as material determination. no summarization , and structure.
Thanking you
Vengaiah Chowdary
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I did that Vengaiah.
I entered characteristic as material and ticked material determination. Then I enter both the materials consulting and training.
In my ECP I have entered hrs as it is T&M (i.e activity type/cost center combination). I could create cost plan succesfully based on hrs entered and labor rates. When I click on sales pricing in project builder to create a quote it says no expenditure items found. How do i corelate the material with the activity type/cost center combination
Regards
Salim
Hi,
Please remove the material determination for cost element. And go with only wbs element as material determination. Under Source -- Selection criteria -- give the WBS number or range. If you have any issue please upload the document.
Thanking you
Vengaiah Chowdary
Edited by: vengaiah chowdary pachava chinna on Dec 19, 2011 9:15 AM
Rashid,
That is quite normal. You have one cost element but the 2 materials. Can you please tell me how would the system select the material (consulting vs training) if you are incurr cost with only one cost element? You have to have at least one cost element per material in the billing not the other way around. You can't combine 2 billing items into one accounting item. This is a highly integrated system after all.
Regards,
Dave
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.