Hi Experts,
We are unable to transfer foreact from APO Dp to ECC.
we can see the forecast data in Planning Book and transffered to ECC through Batch Job. When we check in spool. It is showing message "Transffered data to R/3. But we can't see the forecast in MD63.
Thanks & Regards,
Manasa
Thanks Alot
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rishi,
we didn't maintain . Thanks. Let me configure.I think we can't tarnsport these entries. becasue logical system is dependent on each Ecc system.
Thanks,
Manasa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
we are not using SNP. Only Demand planning. these results are transffered to ECC .
Thanks,
manasa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I transfferd to SNP. It transffered to SNP.But not to ECC.
One more thing, when i checked in /SAPAPO/CC._Supply chain Cock pit . there i can see PIR'S for plant X not Plant Y..
Thanks,
Manasa
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
1) Check if Product location exists in ECC and APO.
A) Both are same
2) Check transaction MD73 instead of MD63. If forecasts are already consumed, you will not see them in MD63.
A) When i check for Plant X, I can able to see forecast data in MD63.But for Plant Y in MD63, it shows message "No requirements were found which correspond to the selection criteria".
As you asked me to check data in MD73, it shows message "No requirements were found which correspond to the selection criteria".
3)In the activity definition in APO if you do not specify a Requirements Type, check what Strategy Group is assigned to the Material master in ECC. Then go to customizing and identify the Planning Strategy. Check if the Planning Strategy has a value assigned for the Requirements Type for Independent Requirements.
A) Y plant is just a replica of Plant X. Both are having same parameters in Material master (ECC)and in Product master (APO).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Manasa
1. Check if Product location exists in ECC and APO.
2. Check transaction MD73 instead of MD63. If forecasts are already consumed, you will not see them in MD63.
3. In the activity definition in APO if you do not specify a Requirements Type, check what Strategy Group is assigned to the Material master in ECC. Then go to customizing and identify the Planning Strategy. Check if the Planning Strategy has a value assigned for the Requirements Type for Independent Requirements.
Rishi Menon
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I am giving some more detail info.
actually we are having 2 plants X and Y.
Y is new plant.
Forecasting data was there in plant X. we are doing reallignment here and transfering data to plant Y.
we are transfering to ecc. we can see forecast data in plant X in MD63, but not in plant Y.
Thanks,
manasa.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
10 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.