on 12-06-2011 7:43 AM
Hi.
Recurring inspection lot is created automatically. But Next Inspection date is wrong.
How to cancel the Recurring inspection??
Hi,
I am adding to what was mentioned above.
Recurring Inspection can be cancelled: By changing/deleting the Inspection Interval in Material Master QM View.
You can extend the next Inspection Interval by changing the Mfg date in the Batch Master in MSC2N transaction. (However, pl. check if this is allowed in your business)
These changes will increase/delete the Automatic creation of Inspection lots for Recurring Inspection.
If the Inspection lot is already created (automatically) because of Recurring Inspection, you can use the steps advised by the gurus above.
Regards, KrishnaM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
in std it is normally not possible to camcel nay lot which is related to any objject like PP order, Delievery etc.
u need to reverse the posting of that object so that the lot status will set as cancel. bcoz all those lots are stcok relevant.
but non- stck relevant u can cancel directly from QA02> function> cacel inspection lot.
Regards
Edited by: D GURU on Dec 6, 2011 8:59 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
if it is stck relevant than,
not through MBST u reverse ur PP order via CORS, if u have posted stck and proposed UD than first reverse the UD via OSS note application and than reverse the 321 Material document via MBST, when stck again their in QC than reverse PP order.
Ur Lot status set as LTCA.
Regards
Thank you.
Next is error message.
-
Material document cannot be processed
Message no. M7130
Diagnosis
This material document was generated through the posting of a physical inventory document, a delivery via Shipping, or some other automatic movement (such as an order confirmation in PP or a usage decision in QM) and cannot be processed with this function.
System Response
In this transaction, the system can only cancel a material document if the latter was created using an Inventory Management transaction.
Procedure
Cancel the material document in the component that created the document.
You can only reverse the goods movement created through the posting of a physical inventory document by carrying out a new physical inventory for the relevant material. You can reverse a delivery effected via Shipping using transaction VL09.
-
Now what I would suggest is ,
1) Remove the Inspection interval from material master
2) Remove the materials from QA07 (deadline monitoring if batches)
then Process this Inspection lot.Do the usage decision & stock posting ( if any)
Now again add material in deadline monitoring & enter inspection interval for fresh lot.
Go to QA02--->Inspection lot -->function -->cancel inspection lot
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.