SAP QM -DMR

Former Member
0 Kudos

what is exactly DMR QDR1

how t works , where it importance

how to maintain & when to maintain

thanks for all experts

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

HI,

DMR means Dynamic Modification rule,

This is used generally for taking the decsion of acceptance and rejection at lot level, Usage decsion level and at MIC level.

Generally we use this where no. of samples and no. lots are in bulk at the time of procurement or say at the time of in-process inspection.

This help of skipping the lots if ur insapection at certain level is ok, otherwise if inspection results are not ok than system proposes u the inspection lot frm where again u need to check ur material ur process etc.

QDR1 is the transaction from eher u need to create this, for this u need to define the rule , rule is nothing but a proposed way through which u need at wat stage u start ur inspection, after acceptance of lot how much skipping or lot u wan and if rejection is found than system proposed the stage for inspection again and inspection lot will be there.

QDH1 is used to trace the behaviour of DMR, system auto proposed a UD against the lot is DMR is there, through this u r able to match wat the decision given by User and wat exactly system proposed fro the particulr lot.

System status shows u which lot skipped and which one is ready fro RR..

for further u need to test in ur dev. a light scenario against GR, ur concept auto cleared after its execution.

Regards

Former Member
0 Kudos

Dear,

Please Refer below

You can try following simple scenario:

In QDR1--->select " DMR @ lot level.

stage 10 > click on insp stage, Severity 04

stage 20 > tick on skip

stage 10

no. of insp : 1

new insp stage : 20

rej : 1

new insp stage : 10

stage 20

no. of skip : 5

new insp stage : 10

rej : 1

new insp stage : 10

Enter this data & Use this DMR in the inspection plan header.

What will happen is when first inspection lot will be created ,you can do RR & UD for this lot.Once this lot is accepted ,

from second lot onwards Inspection lot will have "SKIP" status.If any one of the 5 lots is rejected then Quality level will reset to stage 10 means under Inspection.

With Regards,