cancel
Showing results for 
Search instead for 
Did you mean: 

Wrong Price in Shopping Cart after PR Changed in ECC

Former Member
0 Kudos

Hi All,

I'm using SRM extended classic scenario, and i have the following scenario:

1. Create PR in ECC using material assigned to contract (contract exist both in SRM and ECC) with quantity 8 PC. This PR document type didn't use release strategy.

2. Transfer PR ECC to SRM using BBP_EXTREQ_TRANSFER

3. SC created in SRM with quantity 8 PC and already assigned to the same contract

4. Run report BBP_SC_TRANSFER_GROUPED to create PO with contract (test mode)

5. No error message when simulate create PO

6. Change PR quantity to 4 PC in ECC

7. Run BBP_EXTREQ_TRANSFER in ECC

8. Shopping cart quantity updated to 4 PC in SRM, but ITEM PRICE BECAME ZERO

9. Run report BBP_SC_TRANSFER_GROUPED to create PO with contract (test mode)

10. Got error message 'Enter the price or deselect the 'Invoice Expected' indicator

When I change PR in ECC, I only change the quantity, not the valuation price. Why the price is changed to zero in shopping cart?

Does anyone here ever face the same problem?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

problem solved. I've raised oss message and got note 1451988