cancel
Showing results for 
Search instead for 
Did you mean: 

GOODS MOVEMENT BETWEEN STORAGE LOCATIONS

Former Member
0 Kudos

Dear Sir

We have a lot storage locations for our poduction differencies. Some materials are produced one storage location as a product and trasfered to another storage location as a raw material.

Our problem is when a user transfer from his storage location to another there is no confirmation that other storage location's user's about the material take over exactly.

In other words, we want to conformations to goods movement between storage locations. By the way, storage locations at the same plant.

How can we set up this? When user A tranfer from storage location 1 to 100 items to storage 2, user B shoul confitm that ı recieve the goods completly.

Your quick and helpful replies highly aprecated

Best Regards

Mustafa

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Fanalist,

When material is transferred from one storage to another storage material document is generated & you can the see in the T.Code MB03 OR MB52 (stock Report) you can check the stock with storage or plant wise.

If you want communicate by mail when document posted you need to configure Workflow.To configure Workflow you need to take the help of Abapers.

Let me know if your problem is solved

Regards

Pradeep

jignesh_mehta3
Active Contributor
0 Kudos

Check with MM Consultants whether any User Exits are available for the Program (Transaction) you are using for Stock Transfer.

If User Exit is available, we can include a ABAP code to check the Movement type & Plant & trigger a mail to concerned user regarding the Quantity of Stock Transfer.

List of Plants & User ID's can be stored in a Z-Table.

Hope this helps,

Thanks,

Jignesh Mehta

jpfriends079
Active Contributor
0 Kudos

Kindly refer following SDN wiki, I hope that might assist you in your reference/understanding:

- SAP wiki on [Transfer Posting|http://wiki.sdn.sap.com/wiki/display/ERPLO/TRANSFER+POSTING]

Regards

JP

Former Member
0 Kudos

I investigate this wiki Stok transfer posting using two-step procodure is what we are looking for. But, there is problem, we use split valuation. Is there any way to use two-step procodure with split valuation.

Best regrds

jpfriends079
Active Contributor
0 Kudos

You can handle this through exit EXIT_SAPMM07M_010 (enhancement MBCFC010).

For further details, refer SAP Note 1432402 - Incorrect valuation type for stock transport order.

This note explain, how you can achieve your requirement.

OR

You can also refer, SAP Note 212532 - Stock transport order with split valuation

Regrads

JP

Former Member
0 Kudos

As I undustand we cannot use stock transfer in two steps with split valuation. Instead of two steps we can onyl use Stock Transfer Order.

If the answer yes, thank you very much all of you.

If there is a way using two spteps with split valuation, plase explain how we can do this.

Best Regards

prasanna_kumar4
Active Contributor
0 Kudos

HI

Through STO you can achieve

STO : Storage location to Storage location under one plant

Do the necessary configuration for STO and also take the help of MM consultants

Regards,

Prasanna