on 11-23-2011 10:57 AM
Hi all.. Below output of CHECKS.log
PhaseTypeCheckInstanceNumbers.java:67)#Java###The detected instance ID ID59836 and the one calculated from the box number ID40737 do not match. A possible reason for that is that you have changed the box number in the central instance instance.properties file.
Attempting upgrade of dual stack 6.40 to NetWeaver EhP 2. On Unix + Ora. Currently stuck at prepare phase(java) of upgrade.
Any suggestion would be great. Is it possible to only upgrade Abap stack? I believed previous system copy is the fault of the error.
Cheerz
Hi,
Correct the java instance id in the file instance.properties. Take restart of system.
Try with the prepare phase again.
Regards,
Deepak Kori
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.