Hi,
When we are doing PGI reversal by VL09, stock is coming back to the location from it was dispatched(LM 25). Can we change the storage location so during revrse goods movement by VL09 stock will come to another storage location(LM23).
Hi Arun
It is not possible to change the storage location when you are doing the reverse goods movement in VL09
--You have done the PGI in Vl01N i.e Goods as already dispatched from this storage location.(LM25) so you cannot change the storage location as ( LM23 ) in VL09
--Once you the reverse in VL09 the goods goes back to this Storage location where it as been dispatched (LM25).
--If you want goods to be dispatched from Storage location (LM23) you have to change Storage location Vl02N before doing the PGI.
--Make sure you need to assign this storage location to your plant & maintain same Material stock in this storage (LM23).
Let me know if your problem is solved
Regards
Pradeep
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I tried it, it seems its not possible to change the Storage location, Its possible only if it has to be cancelled and do it a fresh
Regards
DSR
Edited by: D.Srinivasa Rao on Nov 23, 2011 11:53 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.