on 11-23-2011 9:30 AM
Hi
We are getting in ECP error as Cost element does not exist in CO area ABC for 11/09/2011,
I checked cost element it is available with validity, if we give manually in line item the error is going
How we can build in cost model system has to pick cost element respective activity.
Thanks
Hi
Please make sure the entry you are making has all the prerequisites. ex: for material, you need to ensure the material master record is fully updated with fields such as valuation class, etc for it to pick cost element automatically.
PSPM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
with activity if you are planning then cost center and activity type rate should be maitain in KP26. So if you want to plan according to activity type then work center is mandatory not cost element.
Regards
Keshav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.