on 11-19-2011 7:34 AM
HI Guru,
I did 261 mov type against production order and inspection lot generated . i did production confirmation without inspection
lot clearence. i dont want without inspection lot clearence production order confirmation..
with regards
dinesh
hi,
Well, its not possible bcoz 02 type is non-stck relevant.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks for ur support
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
There is one way
You can check the user exit CONFPP05 (Customer Specific Input Checks when Saving) and its function exit EXIT_SAPLCORF_105
Check here whether status of the associated inspection lot is "UD"
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
On thing if u r having consumption material and there is lot for that material of 02 type than this lot is non -stck relevant, secondly if it is In-Process production and u have lot of 03 type than again its a non-stck relevant lot, in both the cases system not stops for order confirmation, while if lot is of 04 type than in standard system restrict you for order confirmation and ur stcok not moved without QA dept.
regards
As per SAP std process ,lot is not created before( 04 inspection type) confirmation but it is after confirmation.So consimption or backflush happens in confirmation where there is provision of creation of inspection lot for header material .
for every 261 movement creation and monitor of the lot will become really complicated if BOM has more number of components.
So seems to be practicle !!
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.