AFS ARUN substitution question

Former Member
0 Kudos

Hellow!

I need ARUN guru help.

I can not manager ARUN substitution while material shortage.

My example

1. There is not material 1 in stock. No future recive in the system.

2. A lot of material 2 in stock.

3. material 2 is set as substitution manerial for material 1

4. Sale manager insert material 1 in sale order and ATP confirm delyvery date as today + 30 (RLT=30).

5. ARUN is configured to select requirements from -300 to + 7 days from today. Only +7 days is set to avoid long stock lock. ARUN is configured to substitute material.

6. ARUN is ran in background and DO NOT SELECT MATERIAL 1 REQUIREMENT becouse confirmed delyvery date is today + 30.

7. I can not select requirements +30 days becouse of long lock period.

How could I make ARUN to select requirements with +30 confirmed delivery day and meke allocation only if substitution happends.

Sorry for long descrip

Andrey Garshin.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Andrey,

You would need to maintain the window for 30 days else ARun will not select hte requirements.This is the only way.

Check for the field SUBRU in the x_bdbs table in the user exit before posting.If it is not empty, then it means substitution has taken place.Then in that case save the results else do not save.

Hope this helps.

Best Regards,

Anitha

Former Member
0 Kudos

Hi!

Thank you for helpfull answer, sorry for delay

could not you say me exit name?

Andrey Garshin.