on 11-09-2011 1:34 AM
How do we setup ChaRM so that when an URGENT CORRECTION is closed, the CR is automatically confirmed.
ie. Urgent correction > Imported to Production > Confirmed > Closed
(at this point the CR would automatically change from Approved to Confirmed)
Thanks!!
hi,
Goto SPRO -> undder change transaction->" define status attributes", check whether ur ZDCF mapping to ZDCR or SDCR
... if it is SDCR change to ZDCR.
Thanks,
Jansi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks shivjansi, that did the trick!!!!!
Have awarded you full points
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi shivjansi
I have checked the config in the IMG (as per your suggestion) and can confirm I have already set this up.
ZDHF E0008 SET_PREDOC
and
ZDHF E0010 SET_PREDOC
This should change the ZDCR status when the ZDHF is closed (E0008) or withdrawn (E0010). But it's not happening
With the ZDMJ I have added similiar config:
ZDMJ E0013 SET_PREDOC
and
ZDMJ E0014 SET_PREDOC
This is working fine for ZDMJ. When a ZDMJ is withdrawn (E0014), the ZDCR goes from Approved to Pending Approval. When a ZDMJ is closed (E0013), the ZDCR goes from Approved to Confirmed.
Just need to get ZDHF doing the same thing!
Shivjansi - is there something else I can look at for ZDHF to get this working? Thanks!!!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Horst,
Thanks. However, I have already added this configuration. For some reason, the ZDCR stays at "Approved" even though ZDHF has been marked as "Closed".
I have added similiar configuration (same as you suggested) for ZDMJ and this is working a treat. It's driving me nuts why the same thing isn't happening for our urgent corrections grrr!!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In our system the status of ZDCR switches automatically to 'realized', when a transport request of a urgent correction is imported into production system.
Is it possible, that some entries have to be created for transaction type ZDCR, too?
That means: "set predoc" when status of urgent corrections changes to 'productive'.
best regards
Horst
Hi,
I remember that in spro-> Scenario-specific settings -> Change request management -> extended configuration -> change transaction ->change transaction types-> make settings of change transaction types-> select ur UR correctiont transaction-> in left panel select assign action-> there you see list of actions make sure you have action as SET_PREDOC
if not please maintain..
Check and update.
Thanks,
Jansi
Yes, it is possible:
Transaction SPRO ( IMG)
Scenario-specific settings -> Change request management -> extended configuration -> change transaction
-> change transaction types -> actions in change request management -> actions - depending on status
Choose your transaction type for urgent correction (e.g. sdhf or zdhf)
and create a new entry with
user status E008 (completed) -> action in SAP CHarM: SET_PREDOC Switch Status of Preceding Document (Generic)
best regards
Horst
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.