cancel
Showing results for 
Search instead for 
Did you mean: 

ATP Configuration

Former Member
0 Kudos

Hi all, first of all thank you very much for the support I can provide. I have an JDBC to RFC scenario and I need to configure the JDBC Communication Channel to run every day at 7:00 pm, as I can set this up, I read in Internet that there is ATP but not very clear to me how to configure it by that ATP also has works in conjunction with the Pool Interval. Thank you very much for the support.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member192238
Participant
0 Kudos

Hi,

Go through this blog it explains how to schedule

u have to schedule the same channel once or multiple times?

Regards

Praveen

baskar_gopalakrishnan2
Active Contributor
0 Kudos

Automatic Time Planning is possible to configure to work every day at specified time for the duration after it starts.

http://help.sap.com/saphelp_nwpi71/helpdata/en/46/ad6cfeb5492a86e10000000a1553f6/content.htm

refer this [link |http://www.dataxstream.com/2010/11/configuring-availability-time-planning-in-sap-pi/]too

Former Member
0 Kudos

Hi Baskar,

If I want to run automatic winding at 7:00 pm, then in the Pool Intertval I put 0 and I configure the ATP Daily, In At Time put 7:00 pm, in Series Start the current date, in Series End put Null and For (Duration) that place? because it is assumed that this is a period in which the channel will be active. Thank you very much for the support.

Former Member
0 Kudos

Hi,

Yes you are right.

Also, when you use ATP then the CC will be stopped so the value in Poll interval will be irrelevant. Once the CC will start at 7 pm then the CC will work normally as per the value in the poll interval.

This is explained in so many blogs in SDN and elsewhere:

http://www.saptechnical.com/Tips/XI/PollingvsATP/Index.htm

Please have a look at them and let us know if you face any issue.