Dear Gurus,

my client requirement if one sample is rejected from the lot whole lot will be rejected:

in QDP1 i have made sample scheme & attach it to sampling plan & this sampling plan is attached to Quality plan for

Result recording .

lot size:0 to 100 EA ,Sample size :5

what we have to define in C1& D1.

how can we check the result wheteer it is working fine o r not???

Siva

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

C1= 0 & D1=1

Create a manual lot in QA01 & then check in QA32 while doing Result recording.

former_member212685
Participant
0 Kudos

Dear sujit,

what will be the valuation mode in QDV1.

siva

Former Member
0 Kudos

Anything related to attribute inspection except manual valuation

former_member212685
Participant
0 Kudos

Dear Sujit,

my requirement is like this if one piece is fail whole lot must be rejected .

we want when we do valuation it must do REJECT only.

siva

Former Member
0 Kudos

Valuation of Inspection lot is different from the valuation of Inspection char during the result recording & both are different/Independent activities.

What you can do "System should valuate the Inspection char as rejected even if one piece is fail."

You have followed steps correctly as

1.putting c1 & d1 values as 1 & 0 in sampling scheme.

2.Enter this sampling scheme in sampling procedure with valuation as " attribute".

3.when you have Qualitative char /mic then you can follow above procedure

for Quantitative char you have to select k factor along with valuation as "variable"

4.Use this sampling procedure against each MIC in task list.

5.make manual lot & check the result recording by rejecting the one sample.