on 10-26-2011 4:08 PM
Hello All,
We have been told by the Basis team that the GRC PRD is ready for use after they have installed it. Just wanted to know if there is any post installation guide or document that we can refer to, to make sure we have the complete installation and settings before we go for the configuration and import of transports from DEV/QAS. An example of things to check can be:
1. If the NWBC is working fine.
2. If all the Connectors are created properly.
3. If all the relevant BC sets are activated.
We need this information to make a check that when the Basis team hands over the PRD server for us to use, we do not miss out checking anything that can have an adverse affect later when we import our configs and data from DEV or QAS.
Thanks and look forward to hear soon.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can get more ideas about the same from the installation guide where you can have a look to see which are the important areas that you need to focus on. Broadly, these are:
SP Levels for the key components.
SICF services
BC sets.
Hope that helps.
Regards,
Hersh.