Please, Help to understand with a following question.

There are 2 kinds of BOM Usage:

2 engineering/design

3 Universal

Data is transferred from ERP in SCM

PP Heuristics SAP_PP_002 at planning chooses 2 that me doesn't arrange.

How and where it is possible to make customizing options that the planned order was created on the basis of 3?

Accepted Solutions (0)

Answers (1)

Answers (1)

Mrinal_K_Roy
Active Contributor
0 Kudos

Hi Timofey,

What happens if BOM usage is 3 in Production version created at ECC and then sent to APO as PPM / PDS.

Regards,

Mrinal

Former Member
0 Kudos

Hi!

Our problem consists that at creation PDS we have 2 BOM(2 and 3).

The planning heuristics chooses 2 BOM as earlier, but structure of assembly 2 BOM Usage incomplete, the list of operations and the routings are absent.

For planning we need to use 3 BOM Usage

I hope you have understood in what my problem?