cancel
Showing results for 
Search instead for 
Did you mean: 

SAP ERP - CTS and Backup error CPIC-CALL: 'ThSAPCMRCV'

Former Member
0 Kudos

hello All,

I have some issues with transport system and when I try to schedule backup jobs in my ERP system. When I try to reconfigure my transport system the following message:

Could not start transport control program tp

Message no. TP608 Diagnosis

There was an attempt to start the transport control program tp using the local RFC interface. An error occurred here.

Error code: 4

RFC error text: timeout during allocate / CPIC-CALL: 'ThSAPCMRCV'

Meaning of the error codes:

03 RFC system failure

04 RFC communication failure

System Response

The function terminates. Details about the error can be found in the trace file of the Gateway Monitor (SMGW).

Procedure

Contact your system administrator or use report RSTPTEST to localize the error. You can then execute the command again.

Al ejecutar el reporte RSTPTEST se presenta:

Check Transport Tool 12.10.2011 16:32:11

DES System DES

tp Interface

Transport Profile

RFC Destination

tp Call

I executed the report RSTPTEST and the result was successful.

Another error is generated when I try to schdule the backup jobs in DB13:

Name and Server : cobogsap01 - cobogsap01

DBMRFC Function : DBM_GETF

Command : DBMMDF

Error : System Error

Error Message : timeout during allocate / CPIC-CALL: 'ThSAPCMRCV' : cmRc=20

I checked the connection between SAP and DB and is OK. I found in some forums and SAP Notes that this error can be fixed with a kernel update, so I updated the SAP kernel, TP and R3trans files but the error continue.

I don't know what more I've to check, so I need your help to solve this issue.

Thanks

HEPC

Accepted Solutions (0)

Answers (1)

Answers (1)

michael_ruth3
Contributor
0 Kudos

Please check the STMS related RFC destination in both child system and

Domain controller.

It seems that the RFCs are not working fine, this might be due to some network issue.

Cheers

Former Member
0 Kudos

hello Michael,

I could fix the transport system, was a network issue, but the DB13 error continue, now when I test the DB connection the following error is show by the PRD system.

Connect. test with "dbmcli db_state" Unsuccessful

I decided to close this message and open another in MaxDB forum.

Thanks

HEPC

Edited by: Hernando Polanía C on Oct 18, 2011 6:32 PM