Tolerances not copied ECC PO

Former Member
0 Kudos

Dear Experts,

We have noticed a problem with tolerances not being replicated to ECC. Upon creation of a PO(with reference to a SHC with a contract) in SRM, the over and under delivery tolerances set in the contract are copied in the SRM PO. Once the PO is replicated in backend, these tolerances are 0% in the backend PO. How can this be corrected - to replicate the same tolerances in ERP?

We are in ECS, SRM 7.0 and ECC 6.0.

Thanks,

pipsquik

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member293881
Participant
0 Kudos

Hi,

SRM and ECC (BE) tolerances must be configured separately and all limits are applied in system independently.

Thanks,

Rahul Mandale