on 10-09-2011 6:45 PM
hi All,
i have a question where the text information is not flown from sales order to delivery document.
would you kinldy tell how to do it (configration/table maintainance).
kimldy suggest.
Thanks,
Umesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please check the following:
Text can be maintained in the sales documents and the same can be copied OR referenced into the subsequent documents like delivery OR billing.
In your case, you have not specified the problem which you are facing either with the Item text OR Header Text.
However, please check the following.
If you are facing the problem referring / copying / duplicating the *Item Text from Sales Order (OR) to Delivery (LF),* please check the text determination procefure in the following areas:
1) Check whether the Text Object is assigned with the Requirement Routine No 50 (Reference document item), then the text will be referenced from OR to LF.
Similarly,
If the problem is with the Header Text then,
The Text Object should have been assigned with the Requirement Routine No 1(Reference Document Header).
Thanks,
Venkat
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please check the following:
Text can be maintained in the sales documents and the same can be copied OR referenced into the subsequent documents like delivery OR billing.
In your case, you have not specified the problem which you are facing either with the Item text OR Header Text.
However, please check the following.
If you are facing the problem referring / copying / duplicating the *Item Text from Sales Order (OR) to Delivery (LF),* please check the text determination procefure in the following areas:
1) Check whether the Text Object is assigned with the Requirement Routine No 50 (Reference document item), then the text will be referenced from OR to LF.
Similarly,
If the problem is with the Header Text then,
The Text Object should have been assigned with the Requirement Routine No 1(Reference Document Header).
Thanks,
Venkat
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.