cancel
Showing results for 
Search instead for 
Did you mean: 

Trnsfr Rqmnt created via PP for discontinuation mateiral and follow up mat

Former Member
0 Kudos

Hi,

Production order was created and it has PN A which has been set for discontinuation (1) with follow up material B. The effective out date is in the future.

When generating WM Picklist, TR was created for both parts and issued. On confirmation only the part marked with discontinuation was consumed.

How can i not generated TR for the follow up part?

Thanks

Jithin

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

In the production order components details, there is a column for Discontinuation of the components.

If you do not want the TR to be generated for follow up material, then in the material master(MRP 4) view of the parent component remove the followup material first and then uncheck the Discontinuation column in the order.

If you want to discontinue the parent component from now with a followup material put "5" into the column it.It also has a option of simple discontinuation as "1" where in TR for the followup material will not be generated.