Hi

For 03 inspection type, inspection lot is creating without batch number, while doing UD it is asking for batch number.

Client will give the batch number only at GR. Im unable to clear the lot.

Please advise, how to create a inspection lot without batch number or clear the lot without batch number.

Note: I used freely defined inspection points for 03 lot.

Thanks&

Regards

Janardhanan

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

It works very well with the QM settings you mentioned.

I mean you can clear the inspection lot with out creation of batch for the order.

Please check it again.

Regards

Bala

former_member512784
Participant
0 Kudos

Hi

Yes I need to clear inspection lot without giving batch number,

Batch number what i mentioned appears in the UD screen, without giving not able to clear the lot. Now Im selecting some batch numbers using f4 button.

It is not related to batch or partial lot settings which we give in routing.

Former Member
0 Kudos

Hi

You need to apply SAP Note 146945 - Making usage decision for production lots w/o batch.

Also with the above note, you need to mentain the below setting,

In recipe

Recipe header> Quality Management> Partial lot assign: Partial lot not supported

Select Operation with QM active, go to details> Insp. point completion: Valuation

Thanks

Sachin

former_member512784
Participant
0 Kudos

I will try thanks

Former Member
0 Kudos

In Material master -->MRP 2 view --->check filed "Batch entry"

Explore options:

Batch in goods issue; no confirmation required

1 Manual batch determination required upon release of order

2 Batch not required in prod./process order; confirmation reqd

3 Automatic batch determination upon release of order

former_member512784
Participant
0 Kudos

Hi Sujit

I checked MRP2 view, in that below mentioned is selected, but still my inspection lot aksing for batch number.

2 Batch not required in prod./process order; confirmation reqd

Please tell me if anything i need to check..

former_member494495
Active Contributor
0 Kudos

Hi

If stock posting and usage decision is not done

Cancel the document in MBST tcode or through MB31 with order and 102 type

former_member512784
Participant
0 Kudos

Hi

I dont want to cancel the order,

This is the procedure followed by client, they will generate batch number after confirmation during GR.

In the mean time i need to clear the inspection lot without giving batch number.

Please advice if there is any other way..